United Airlines (Chicago) has reportedly found improperly installed wiring on one of its newly delivered Boeing 787-8 Dreamliners, the same system that caused the JAL 787-8 fire in a battery at Boston according to the Wall Street Journal.
Read the full WSJ report about the latest problems with the new aircraft: CLICK HERE
Copyright Photo: Michael B. Ing. The pictured Boeing 787-8 N26906 (msn 34829) at Los Angeles was handed over on October 31, 2012 to the carrier. It is unclear which aircraft is involved. United has taken delivery of six Dreamliners.
