Tag Archives: Boeing 787-800

Boeing announces a world 787 “Dream Tour”

A new look for ZA003, originally uploaded by The Boeing Company.

Boeing (Chicago) will begin a six-month “Dream Tour” with a 787 Dreamliner. According to Boeing, “customers and partners around the world will experience the revolutionary technology and passenger innovation offered on the first new airplane of the 21st century.”

The December schedule for the 787 Dream Tour includes six stops in Asia , Africa and the Middle East :

December 4-11 : China with stops in Beijing , Guangzhou and Haikou to visit customers, partners, and government officials including representatives from Civil Aviation Administration of China (CAAC), Air China, China Southern, Hainan Airlines, Aviation Industries of China (AVIC) and Chengdu Aircraft Industrial Co. (CAC).

December 11-16 : Africa with stops in Addis Ababba, Ethiopia and Nairobi, Kenya to visit Ethiopian Airlines and Kenya Airways.

December 16-19 : Middle East stop in Doha to visit Qatar Airways.
Specific dates for the subsequent segments of the tour will be announced about one month prior to the events. Additional tour stops are being planned for January through April 2012 and will be detailed in future announcements.
Many of the stops will include opportunities for local media to tour the airplane and talk with Boeing executives and pilots.

Aviation enthusiasts can follow the progress of the 787 tour at www.newairplane.com. Videos, photos and reports from the tour stops as well as an inside look at the airplane, will be featured beginning with the first stop next week.

The Dream Tour airplane, ZA003, (N787EX) has been retrofitted with special interior features designed to highlight the unique cabin features and performance capabilities of the Dreamliner. The flight test equipment on board ZA003, the third 787 to be built, has been removed and a stunning new interior has been installed (see above). The airplane also has received a refreshed Boeing livery.

Visitors will be greeted by the spacious signature 787 entryway sky light and gathering area. The LED lighting, standard on all 787s, will be demonstrated throughout the tour airplane. Visitors will experience the dynamic affect of this new technology to make meal time more enjoyable, sooth passengers during restful periods and gently wake them following a long flight.

Visitors also will find a luxurious business-class cabin with a dozen lay-flat seats, an overhead crew rest compartment and an economy class section. A large open space between the two economy class sections allows Boeing to spotlight the features of the 787 with displays and demonstrations. The exterior of the airplane has been repainted in the standard Boeing livery.

Copyright Photo: Boeing.

Boeing hands over the first 787 Dreamliner to ANA

Boeing (Chicago) and ANA (All Nippon Airweays) (Tokyo) yesterday (September 25) as planned signed the formal documents completing the contractual delivery of the first 787 Dreamliner. Celebrations to mark this historic milestone begin today in Everett with a delivery ceremony followed by flyaway of the airplane on Tuesday. The signing comes after a series of flights, inspections and the transfer of funds.

Celebrations for Boeing employees begin Monday at 6 a.m. (0600) (Pacific time) outside the 787 factory in Everett with the static display of ZA002, one of the flight test airplanes painted in ANA’s livery. ANA and Boeing executives, employees, partners and government officials will gather at 9 a.m. (0900) for the delivery ceremony in the same location. The pictured “Airplane 24”, painted in ANA’s special livery, will join the display during the ceremony. Flyaway of the airplane to Tokyo is scheduled for Tuesday morning at 6:35 a.m. (0635) from Paine Field.

A live webcast of Monday’s delivery events and Tuesday’s flyaway can be seen at www.newairplane.com. Video highlights of those events also will be posted to the website.

Copyright Photo: Nick Dean. Please click on the photo for additional details.

ANA, Boeing set date for first 787 Dreamliner delivery

Boeing (Chicago) and ANA (All Nippon Airways) announced on August 26 they will celebrate the delivery of the first 787 Dreamliner on September 26 in Everett (Paine Field). The actual contractual delivery occurs on September 25. Events throughout the day on September 26 will commemorate delivery of this game changing airplane to its launch customer.

ANA’s first Dreamliner will arrive in Tokyo on September 28, following a September 27 departure from Everett (Paine Field) and will be greeted by ANA employees, media and Japanese partners.

Copyright Photo: Gabor Hajdufi. Please click on the photo for additional information.

Boeing 787 Dreamliner receives FAA, EASA certification

Boeing (Chicago) 0n August 26 received certification for the all-new 787 Dreamliner from the U.S. Federal Aviation Administration (FAA) and the European Aviation Safety Agency (EASA) during a ceremony at the company’s Everett, Washington, facility.

FAA Administrator Randy Babbitt presented the U.S. Type Certificate, which verifies that the 787 has been tested and found to be in compliance with all federal regulations, to 787 Chief Pilot Mike Carriker and 787 Vice President and Chief Project Engineer Mike Sinnett, both of whom have worked on the program since the day it began.

Babbitt presented the amended Production Certificate 700 to John Cornish, vice president of 787 Final Assembly & Delivery, and Barb O’Dell, vice president of Quality for the 787 program. The Production Certificate adds the 787 to the list of Boeing Commercial Airplane production systems that have been found to be compliant with all federal regulations.

Copyright Photo: Brandon Farris. Please click on the photo for additional information.

Boeing completes 787 flight testing for Rolls-Royce aircraft

Boeing (Chicago) completed all flight tests required for type certification of the 787-8 Dreamliner with Rolls-Royce engines on July 13, 2011. The final flight occurred on July 13 onboard the pictured N1006F (ZA102), the ninth 787 to be built. Captain Mike Carriker, chief pilot for the 787 program, brought ZA102 back to its home base at Paine Field in Everett at 1:58 p.m. (1358) (Pacific time) following a 90 minute flight that originated in Billings, Montana. During the flight, the 14-person crew completed simulations of a dispatch with a failed generator and failed fuel flow indication.

Video highlights of 787 flight testing can be found at:ย http://youtu.be/9yRmwGMNuDo.

Flight testing continues for 787s with GE engines and for Boeing test points not related to certification.

Copyright Photo: Nick Dean. Please click on the photo for additional details.

Boeing plans to finalize 787 testing this weekend

Boeing (Chicago) is planning to finish flight testing for its 787 Dreamliner this weekend according to this report by Reuters.

The first production 787 will be handed over to ANA in September. The long wait is also over.

Read the full report: CLICK HERE

Copyright Photo: Brandon Farris. Please click on the photo for additional information.

This ANA painted Boeing 787 Dreamliner arrives in Japan to begin stimulated airline service

ANA (All Nippon AIrways) and Boeing today (July 4) began an important validation of their readiness for the 787 Dreamliner’s entry into service.

Throughout the coming days, ANA pilots, together with Boeing, will fly a 787 on actual airline routes in Japan using airline dispatch and flight rules. ANA’s mechanics and ground crews also will gain experience with the airplane in a simulated operational environment.

The 787 debuted in Asia yesterday (July 3) with a landing at Haneda Airport in Tokyo at 6:21 a.m. (0621) (local time). More than a thousand media, ANA employees and aviation enthusiasts gathered to witness the 787’s arrival and welcome ANA pilots Captains Masayuki Ishii and Masami Tsukamoto and Boeing pilots Captains Mike Carriker, Heather Ross and Ted Grady.

Sporting ANA’s livery, this 787 flight test airplane designated ZA002 flew nonstop to Tokyo from Seattle.

Throughout the week-long validation, the 787 will experience simulated day-to-day airline operations. maintenance, servicing and flight crew operations will be conducted at five airports in Tokyo, Osaka (Itami and Kansai), Okayama and Hiroshima.

ANA’s first scheduled service with the 787 will be either the Haneda-Okayama or Haneda-Hiroshima route when deliveries begin later this year.

ANA has 55 Dreamliners on order. ANA will deploy the 787 across its route network as an integral part of its strategy to strengthen its position and support its growth and expansion plans.

Boeing plans to deliver the first 787 to ANA in the August to September timeframe.

Copyright Photo: Nick Dean. Please click on the photo for the aircraft details.

Boeing begins final phase of 787 flight testing

Boeing (Chicago) on June 26 started Function & Reliability (F&R) testing and extended operations (ETOPS) demonstrations on the 787 Dreamliner. This is the final phase of flight testing prior to certification of the airplane.

ANA will take the first delivery in the August to September 2011 time period.

F&R testing simulates various normal and non-normal operations for the airplane, in a realistic airline-like flight environment. ETOPS refers to extended operations โ€“ for twin jets, flights that are more than 60 minutes away from a suitable landing field. During ETOPS demonstrations the company validates the airplane’s ability to safely divert for a variety of reasons, including long diversions with one engine shut down.

In addition to F&R and ETOPS testing for the 787 with Rolls-Royce engines, Boeing continues certification testing on 787s with General Electric engines and will conduct a separate F&R/ETOPS test program for that version of the airplane. Other activities will continue on the flight test fleet to support Boeing objectives including examining potential technologies for the 787-9 and testing engine improvement packages.

Copyright Photo: Nick Dean. Please click on the photo for additional information.

Boeing and ANA to readiness test this Dreamliner in Japan starting on July 4

Boeing (Chicago) and ANA-All Nippon Airways (Tokyo) today (May 26) announced how the two companies will work together to help prove the 787 Dreamliner’s readiness to enter service on a commercial basis. Using the second flight test aircraft, known as the pictured ZA002, they will simulate in-service operations across several airports in Japan in a service ready operational validation. The validation is expected to take place the week of July 4. Anticipated city pairs include trips between Haneda Airport in Tokyo and airports in Osaka (Itami and Kansai), Okayama and Hiroshima.

This will be the 787’s maiden appearance in Japan. ANA is the launch customer for the aircraft and has 55 Dreamliners on order. The 787, which will be deployed across the ANA route network, is an integral part of ANA’s strategy to strengthen its position and support its growth and expansion plans.

ANA’s maintenance crews also will practice maintenance and servicing of the 787 during the validation. This will include typical ground servicing activities, fit checks of airplane jacks and maintenance hangar stands, towing and refueling the airplane, and other routine maintenance operations. Watch this video to see how Boeing and ANA are planning for the validation.

Similar service ready validations have been conducted with great success on previous Boeing programs, including the 777, 737NG and 757-300.

Boeing plans to deliver the first 787 to ANA in the August to September timeframe.

Copyright Photo: Gabor Hajdufi. Please click on the photo for background information.

The IAM takes Boeing to the NLRB over its plans to build the 787 in South Carolina

Boeing (Chicago) is fighting the complaint brought to National Labor Relations Board (NLRB) by the IAM over Boeing’s plans to also produce the 787 Dreamliner in Charleston, SC. Boeing issued the following statement:

“The Boeing Company said it will vigorously contest a complaint brought before the National Labor Relations Board (NLRB) on April 20 by the leadership of the International Association of Machinists and Aerospace Workers (IAM). The complaint challenges Boeing’s 2009 decision to complement its production capacity in Washington state with a new assembly plant in South Carolina and seeks to force Boeing to place its second 787 final assembly line in Puget Sound instead of Charleston.

“This claim is legally frivolous and represents a radical departure from both NLRB and Supreme Court precedent,” said Boeing Executive Vice President and General Counsel J. Michael Luttig. “Boeing has every right under both federal law and its collective bargaining agreement to build additional U.S. production capacity outside of the Puget Sound region.”

Union officials have been pressing the NLRB for more than a year to bring forward the complaint and force Boeing to abandon plans to produce three 787 airplanes per month in the company’s new North Charleston, S.C., factory and build them instead in Puget Sound. With today’s action by the NLRB’s acting general counsel, the board now will begin a formal proceeding to hear the IAM’s allegations.

Boeing also was critical of the timing of the complaint, which comes a full 17 months after the company announced plans to expand its manufacturing capacity in the United States in South Carolina. Construction of the factory is nearly complete and the company has hired more than 1,000 new workers. Final assembly of the first airplane is slated to begin in July.

Boeing has made it clear that none of the production jobs created in South Carolina has come at the expense of jobs in Puget Sound and that not a single union member has been adversely affected. In fact, IAM employment in Puget Sound has increased by approximately 2,000 workers since the decision to expand in South Carolina was made in October 2009.

Prior to that decision, Boeing held extensive discussions with the IAM over the potential placement of the new 787 production capacity in Puget Sound. Those discussions ended with Boeing unable to reach agreement with union leadership on demands that would have hampered the company’s competitiveness in the increasingly competitive global market for large commercial airplanes.

Luttig said Boeing was confident that the claim would be rejected by the federal courts. He also emphasized that the company will begin assembling 787s in South Carolina this summer, as planned. “We fully expect to complete our new state-of-the-art facility in South Carolina in the weeks ahead, and we will be producing 787s โ€“ America’s next great export โ€“ from our factories in both Puget Sound and South Carolina for decades to come,” he said.”

Copyright Photo: Nick Dean. Please click on the photo for additional information.