American Airlines‘ (Dallas/Fort Worth) first Boeing 787-8 Dreamliner (N800AN, msn 40618) is now being assembled at Boeing’s Paine Field facility near Everett, Washington. The company has issued the above photo of the mid section of the fuselage being attached to the wings. The first 787 should be rolled out of the assembly plant in the first week of October. The second 787-8 will be entering final assembly around September 26.
The airline will take delivery of its first 787-8 in December. The first 787-8 is scheduled to enter revenue service in early 2015 initially on domestic routes.
American has 42 Boeing 787s on order including 16 787-8s and 26 787-9s, with 58 options. The airline is scheduled to take delivery of two 787s this year, 11 in 2015, 13 in 2016 and nine in 2017.
American will replace some of its older Boeing 767-300s with the new 787s.
Copyright Photo: American Airlines. Theย first 787 takes shape in Position 1A at Paine Field, Everett, where the mid-body and the wings were joined.
American Airlines (current livery):ย ![]()
American Airlines (historic liveries):ย ![]()

You must be logged in to post a comment.