CBS 4 in Miami is doing a special TV presentation called “The Big X” on the new safety upgrades to the diagonal runway 12-30 at Miami International Airport (MIA). The story runs tonight at 11 pm (2300) local time (EDT) on channel 4 in Miami. It will also appear on cbsmiami.com after its airing.
Runway 12-30 is on a 528-day rehabilitation project. The project will add LED lights that use much less power and last many years without replacement.
Copyright Photo Above: CBS 4/Brian Andrews.
FAA Airport Diagram for MIA:
Airport Runway Statistics: