Tag Archives: N800AN

American Airlines’ first Boeing 787-8 Dreamliner emerges from the Boeing paint shop

American 787-8 N800AN (13)(Name)(American)(LR)

American Airlines‘ (Dallas/Fort Worth) first Boeing 787-8 Dreamliner (N800AN, msn 40618) emerged from the paint shop this morning at Boeing’s Everett facility. American has released these photos.

American 787-8 N800AN (13)(Tail)(American)(LR)

N800AN will be delivered in December. The first 787-8 is scheduled to enter revenue service in early 2015 initially on domestic routes.

American has 42 Boeing 787s on order including 16 787-8s and 26 787-9s, with 58 options. The airline is scheduled to take delivery of two 787s this year, 11 in 2015, 13 in 2016 and nine in 2017.

American will replace some of its older Boeing 767-300s with the new 787s.

In other news, US Airways has repainted its Airbus A319-112 N744P (msn 1287) (below) in the 1974 Piedmont Airlines (1st) (Winston-Salem) livery now with American titles. US Airways is gradually repainting all of the legacy jets with American titles.

American-US Airways A319-100 N744P (14-Piedmont 74)(Grd)(American)(LR)

All Images by American Airlines (except the slide show by AirlinersGallery.com).

American Airlines (current):ย AG Slide Show

Piedmont Airlines (1st) Aircraft Slide Show:

http://airlinersgallery.smugmug.com/Airlines-UnitedStates-2/Airlines-UnitedStates-2/Piedmont-Airlines-1st

American Airlines’ first Boeing 787-8 Dreamliner moves one step closer to roll-out

American 787-8 N800AN in production at PAE (AA)(LRW)

American Airlines‘ (Dallas/Fort Worth) is keeping interested fans informed on the progress of its first Boeing 787-8 Dreamliner currently on the production line at Boeing’s Paine Field assembly plant. The pictured Dreamliner with the line number of 241 will become N800AN (msn 40618) when it is delivered. The jetliner is due to roll out this month.

The airline will take delivery of its first 787-8 in December. The first 787-8 is scheduled to enter revenue service in early 2015 initially on domestic routes.

American has 42 Boeing 787s on order including 16 787-8s and 26 787-9s, with 58 options. The airline is scheduled to take delivery of two 787s this year, 11 in 2015, 13 in 2016 and nine in 2017.

American will replace some of its older Boeing 767-300s with the new 787s.

In other news, American has asked the U.S. Department of Transport (DOT) for Delta’s Tokyo Haneda authority according to Bloomberg. If AA is able to wrestle away the authority, it plans to operate a year-round route to Los Angeles rather than Delta’s seasonal use of its Haneda-Seattle/Tacoma authority.

Copyright Photo: American Airlines.

American Airlines (current):ย AG Slide Show

American Airlines’ first Boeing 787 Dreamliner takes shape at Paine Field, Everett

American first 787-8 final assembly (American)(LR)

American Airlines‘ (Dallas/Fort Worth) first Boeing 787-8 Dreamliner (N800AN, msn 40618) is now being assembled at Boeing’s Paine Field facility near Everett, Washington. The company has issued the above photo of the mid section of the fuselage being attached to the wings. The first 787 should be rolled out of the assembly plant in the first week of October. The second 787-8 will be entering final assembly around September 26.

The airline will take delivery of its first 787-8 in December. The first 787-8 is scheduled to enter revenue service in early 2015 initially on domestic routes.

American has 42 Boeing 787s on order including 16 787-8s and 26 787-9s, with 58 options. The airline is scheduled to take delivery of two 787s this year, 11 in 2015, 13 in 2016 and nine in 2017.

American will replace some of its older Boeing 767-300s with the new 787s.

Copyright Photo: American Airlines. Theย first 787 takes shape in Position 1A at Paine Field, Everett, where the mid-body and the wings were joined.

American Airlines (current livery):ย AG Slide Show

American Airlines (historic liveries):ย AG Slide Show

 

 

AG Banner Taglines 13.9 million 1800