Tag Archives: DXB

Boeing is confident the 787 will be flying “within weeks” with a fortified power pack

Boeing (Chicago) believes the grounded 787 could be flying “within weeks” with a fortified power pack that would eliminate the possibility of a battery fire according to this report by Reuters and statement by Boeing. This assumes the Federal Aviation Administration (FAA) (Washington) will approve the final process and fix after testing which it has approved.

Boeing issued this statement as an update:

Boeing hasย announced that a comprehensive set of improvements that will add several layers of additional safety features to the lithium-ion batteries on 787 commercial jetliners are in production and could be ready for initial installation within the next few weeks. New enclosures for 787 batteries also are being built and will be installed in airplanes in the weeks ahead.

These improvements, which continue to undergo extensive certification testing, will allow operators to resume commercial flights with their 787s as soon as testing is complete and the U.S. Federal Aviation Administration (FAA) and other international regulators grant their final approval.

The improvements include enhanced production and operating processes, improved battery design features and a new battery enclosure.

“As soon as our testing is complete and we obtain regulatory approvals, we will be positioned to help our customers implement these changes and begin the process of getting their 787s back in the air,” said Boeing Commercial Airplanes President and CEO Ray Conner. “Passengers can be assured that we have completed a thorough review of the battery system and made numerous improvements that we believe will make it a safer, more reliable battery system.” Battery system changes include changes to the battery itself, the battery charging unit and the battery installation.

Earlier this week the FAA approved Boeing’s certification plan, which lays out the discrete testing to be done to demonstrate that the battery improvements address the conditions laid out in the Airworthiness Directive that has suspended 787 commercial operations.

Development Team Created Solution

The enhancements to the battery system address causal factors identified by the Boeing technical team as possible causes of battery failure. The technical team’s findings also were verified by an independent group of lithium-ion battery experts from a number of industries, universities and national laboratories.

“We’ve come up with a comprehensive set of solutions that result in a safer battery system,” said Mike Sinnett, vice president and chief project engineer, 787 program, Boeing Commercial Airplanes. “We have found a number of ways to improve the battery system and we don’t let safety improvements go once they are identified. We incorporate them into our processes and products.”

Enhanced Production Controls and Operating Processes

The first layer of improvements is taking place during the manufacture of the batteries in Japan. Boeing teamed with Thales, the provider of the integrated power conversion system, and battery maker GS Yuasa to develop and institute enhanced production standards and tests to further reduce any possibility for variation in the production of the individual cells as well as the overall battery.

“We’ve all developed a better understanding of the sensitivities of this technology to variations during the manufacturing process,” said Sinnett. “And we all feel the need to increase monitoring of this process on an ongoing basis.”

Four new or revised tests have been added to screen cell production, which now includes 10 distinct tests. Each cell will go through more rigorous testing in the month following its manufacture including a 14-day test during which readings of discharge rates are being taken every hour. This new procedure started in early February and the first cells through the process are already complete. There are more than a dozen production acceptance tests that must be completed for each battery.

Boeing, Thales and GS Yuasa have also decided to narrow the acceptable level of charge for the battery, bothย by lowering the highest charge allowed and raising the lower level allowed for discharge. Two pieces of equipment in the battery system โ€“ the battery monitoring unit and the charger are being redesigned to the narrower definition. The battery charger will also be adapted to soften the charging cycle to put less stress on the battery during charging.

Improved Battery Design Features

Changes inside the battery will help to reduce the chances of a battery fault developing and help to further isolate any fault that does occur so that it won’t cause issues with other parts of the battery.

To better insulate each of the cells in the battery from one another and from the battery box, two kinds of insulation will be added. An electrical insulator is being wrapped around each battery cell to electrically isolate cells from each other and from the battery case, even in the event of a failure. Electrical and thermal insulation installed above, below and between the cells will help keep the heat of the cells from impacting each other.

Wire sleeving and the wiring inside the battery will be upgraded to be more resistant to heat and chafing and new fasteners will attach the metallic bars that connect the eight cells of the battery. These fasteners include a locking mechanism.

Finally, a set of changes is being made to the battery case that contains the battery cells and the battery management unit. Small holes at the bottom will allow moisture to drain away from the battery and larger holes on the sides will allow a failed battery to vent with less impact to other parts of the battery.

New Battery Enclosure

The battery case will sit in a new enclosure made of stainless steel. This enclosure will isolate the battery from the rest of the equipment in the electronic equipment bays. It also will ensure there can be no fire inside the enclosure, thus adding another layer of protection to the battery system. The enclosure features a direct vent to carry battery vapors outside the airplane.

New titanium fixtures are being installed in the electronics equipment bays to ensure the housing is properly supported.

“Our first lines of improvements, the manufacturing tests and operations improvements, significantly reduce the likelihood of a battery failure. The second line of improvements, changes to the battery, helps stop an event and minimize the effect of a failure within the battery if it does occur. And the third line of improvements, the addition of the new enclosure, isolates the battery so that even if all the cells vent, there is no fire in the enclosure and there is no significant impact to the airplane,” said Sinnett.

Testing Status

Testing to gain FAA approval of the battery enhancements has already started, with the FAA’s permission.

During engineering testing, which occurs prior to certification testing, the team demonstrated that the new housing could safely contain a battery failure that included the failure of all eight cells within the battery. The “ultimate” load is the equivalent of 1.5 times the maximum force ever expected to be encountered during a battery failure. The housing easily withstood this pressure and did not fail until the pressure was more than three times the ultimate load.

Through another test, the team demonstrated that fire cannot occur within the new enclosure. Its design eliminates oxygen, making the containment unit self-inerting. Inerting is a step above fire detection and extinguishing as it prevents a fire from ever occurring. The design also vents all vapors by venting directly outside of the airplane rather than into the equipment bay.

“We put this new design through a rigorous set of tests. We tried to find a way to introduce a fire in the containment but it just wouldn’t happen. Even when we introduced a flammable gas in the presence of an ignition source, the absence of oxygen meant there was no fire.

“We drew from the new industry standard, DO311, established by RTCA, to establish our testing plan,” said Sinnett. “These standards weren’t available when we set the testing plan for the baseline battery and they helped us ensure the new design is robust and safe. We intend to show, during certification, that the 787 battery meets all objectives of DO-311 and only deviates from specific requirements where the 787-unique items are not covered by the standards.” RTCA is a not-for-profit organization that serves as a federal advisory committee in establishing guidelines for the aviation industry.

Working towards Resuming Flights

“We are following all of the necessary protocols to get our new design fully approved and properly installed so that we can help our customers start flying as soon as possible. We’re simultaneously moving out on an effort to resume deliveries but completing our certification work and getting the delivered fleet flying again is our first priority,” said Conner. “Our customers and their passengers have been incredibly patient as we have worked through this process and we thank them very sincerely for their continued support and confidence in the 787.

“The more-electric architecture of the 787 brings real value not just to the airlines but to our industry. By reducing fuel use, we are reducing our environmental footprint. This battery technology is an important part of the more-electric architecture, which is helping us to cut fuel use by more than 10 billion gallons of fuel over the life of this program.

“New technologies require extra attention and hard work, but the benefits are real.”

Read the full Reuters story: CLICK HERE

Copyright Photo: Paul Denton. Now grounded,ย Qatar Airways‘ Boeing 787-8 A7-BCL (msn 38330) completes its final approach into Dubai International Airport.

Qatar Airways:ย AG Slide Show

Emirates launches a new route to Algiers

Emirates Airline (Dubai) on March 1 launched daily nonstop service from Dubai toย Houari Boumediene Airport in Algriers. It is the 22ndย gateway for Emirates in Africa and the airlineโ€™s 130th international destination. The new route will be operated with Airbus A330-200 aircraft.

Copyright Photo: Christian Volpati.ย Airbus A330-243 A6-EKQ (msn 518) arrives at the Dubai hub.

Emirates:ย AG Slide Show

Emirates is coming to Clark International Airport in the Philippines

Emirates Airline (Dubai) announced it will begin daily, non-stop flights to Clark International Airport, the airlineโ€™s second destination in the Philippines starting on October 1.

Emiratesย has been operatingย flights to Manila, the capital of the Philippines, since 1990 and, due to the demand, has continued to increase its flight frequency on the route to its current triple daily, nonstop service.

Clark International Airport is located in the province of Pampanga in Central Luzon, which is 80 kilometres to the north of Manila. Its strategic location means it has a catchment area of 17 million people.

The new route will be operated with two-class Boeing 777-300 ER aircraft. Flight EK 338 will depart Dubai at 0400 and arrive at Clark International Airport at 1640. The return flight, EK 339 will depart at 1835 and arrive at Dubai International Airport at 2305.

A government study estimated that there are 10 million Filipinos living outside the Philippines โ€“ about 10% of the countryโ€™s home population. The largest number of overseas Filipinos reside mainly in the United States. The region with the largest temporary overseas Filipino population is the Middle East with approximately 2.9 million Filipinos, with 680,000 living in the UAE.

Central Luzon is one of the leading growth regions in the Philippines and is host to the countryโ€™s premier economic zones โ€“ the Clark Freeport Zone and the Subic Bay Freeport Zone.

Copyright Photo: Paul Denton. Boeing 777-31H ER A6-EGW (msn 35601) approaches Dubai International Airport for landing.

Emirates:ย AG Slide Show

Bahrain Air declares bankruptcy and shuts down

Bahrain Air (Bahrain) has suddenly ceased all operations. The airline declared voluntaryย bankruptcyย and filed for liquidation on February 12, 2013. The airline operated a few days over five years and operated two Airbus A319s and two A320s. Bahrain Air was hurt badly by the previous Arab Spring demonstrations in Bahrain.ย The airline issued the following statement:

Statement from the Board of Directors of Bahrain Air

“Bahrain Air held an Extraordinary General Meeting today (February 12) at which the shareholders made the decision to announce the companyโ€™s immediate suspension of operations and to file for voluntary liquidation in accordance with the Kingdom of Bahrain’s Commercial Companies Law.

The company sustained considerable financial losses as a result of the unstable political and security situation in Bahrain. In 2011, during Bahrainโ€™s State of National Emergency, the airline was instructed to suspend flights to several destinations, and also suffered from the lack of traffic to and from Bahrain, and from the restrictions on the Saudi Causeway. Despite the Royal Decree number 18 for 2011 Article 5/10 regulating land, sea and air transportation during Bahrainโ€™s State of National safety which states that all affected parties will be fairly compensated, the airline, despite making official claims, has received no compensation.

The airline is now being required to make immediate payments on past government debts or face closure at the same time as having its scheduled operations, both destinations and frequencies, being reduced considerably by the Civil Aviation Affairs in the Ministry of Transportation. This effectively strangles the airline by simultaneously requesting payments and reducing its ability to generate the necessary revenues both to make these payments and to sustain long term profitability. The shareholders of the company have spared no effort to support the airline financially since its inception and to support the airline and Bahrain through the unrest in 2011. The airline has also spared no effort to negotiate a solution with the Minister of Transportation (who is also an active board member of Gulf Air). However, he has shown no inclination to provide a meaningful solution. His decisions to restrict route approvals have cost the airline BD 4.5 million in lost revenues over the last 3 months.ย  The position of the Minister was made clear when, during a time of negotiation, he only extended the companyโ€™s AOC, after operational audits had been passed, for two months instead of one year. After meetings, the latest company proposal was forwarded last Thursday 7th February. During the EGM, a very negative response was received providing only minor route concessions in return for payments of over BD 4 million. In the circumstances, given the position of the Minister, the shareholders decided that had no option but to discontinue financial support and put the company into voluntary liquidation.

Today (February 12) is a sad day for all Bahrain Air shareholders and employees, and for our loyal and valued guests, and all those who valued the ย freedom of choice when making their travel plans. We also helped promote Bahrain as a business and leisure destination and Bahrain International Airport as a passenger hub in line with the Kingdomโ€™s Economic Vision 2030. ย In doing so, we have demonstrated that it is possible to provide high quality and reliable scheduled airline services a fraction of the costs achieved by state airlines if fair practices and equal opportunities are rendered. We have created a proud legacy, with one of the best records for on time performance and value for money in the region. Finally, we would like to thank our staff for their hard working and lasting devotion to the cause of Bahrain Air.”

Copyright Photo: Paul Denton. Airbus A320-214 A9C-BAO (msn 4600) taxies to the gate at Dubai.

Bahrain Air logo-1

Bahrain Air:ย AG Slide Show

Route Map:

Please click on the map to expand.

Please click on the map to expand.

PIA’s Boeing 737-33A AP-BEH makes a wheels-up landing at Muscat today

PIA logo

PIA-Pakistan International Airlines (Karachi) had an incident today at Muscat, Oman. Boeing 737-33A AP-BEH (msn 25504) operating flight PK 259 from Sialkot, Pakistan to Muscat suffered a rough landing on its arrival. The left main gear collapsed on landing. There were no injuries to the 108 passengers and crew members on board.

Read the full story from Gulf News: CLICK HERE

Copyright Photo: Paul Denton. AP-BEH is pictured arriving at Dubai in 2010 before it was repainted in the current 2010 livery.

PIA-Pakistan International Airlines:ย AG Slide Show

Emirates sees a new Boeing 777X version to be available in 6-9 months

Emirates Airline (Dubai) expects a new version of the very successful Boeing 777ย to be available to airline customers in six to nine months according to this report by Reuters. Emirates has stated it needsย will need to replace its older 777s from 2017.

Currently Emirates operates a total of 122 Triple Sevens, including 777-200s, 777-200 ERs, 777-200 LRs, 777-300s, 777-300 ERs and 777F freighters.

Read the full report: CLICK HERE

Copyright Photo: Paul Denton. Sleek Boeing 777-31H ER A6-EGX (msn 35602) arrives back at the Dubai hub.

Emirates:ย AG Slide Show

Iran Aseman Airlines keeps the Boeing 727 alive as a passenger airliner

Iran Aseman Airlines (Tehran) continues to operate the Boeing 727 as both a passenger aircraft and as a freighter, one of the last operators of the venerable trijet. The airline started operations in 1980. Iran is currently under international sanctions.

Copyright Photo: Paul Denton. The 175-seat Boeing 727-228 EP-ASB (msn 22082) operated a flight to Dubai today with passengers. The airframe was originally delivered new to Air France as F-GCDB on April 11, 1980 (almost 33 years ago)! The airliner has also flown with Air Charter and Euralair before Iran Aseman acquired the aircraft on October 7, 1994. In late 2012 the company repainted the aircraft adding a new blue tail with a new white tail logo. This 727 keeps on flying with passengers!

Hot New Photos:ย AG Hot New Photos

Iran Aseman Airlines:ย AG Slide Show

Iran Aseman logo

Route Map:

Please click on the map for the full-size view.

Please click on the map for the full-size view.

Iraqi Airways adds its first two Airbus A320s

Iraqi Airways (Baghdad) on January 15, 2013 added its first two Airbus A320s. The pictured A320-214 YI-ARA (msn 5115) and YI-ARB (msn 5290) have joined the mainly Boeing fleet.

Copyright Photo: Paul Denton. A320-214 YI-ARA is captured arriving at Dubai today devoid of any color except the titles. Is a new livery coming for Iraqi?

Iraqi logo

Iraqi Airways:ย AG Slide Show

 

Emirates supports the Expo 2020 in Dubai, United Arab Emirates

Emirates Airline (Dubai) is supporting the United Arab Emirates’ bid for Dubai as the location of the 2020 Exposition (World’s Fair). Dubai is competing against Ayutthaya (Thailand), Izmir (Turkey), Sao Paulo (Brazil) and Yekaterinburg (Russia) for the final selection of the location.ย International Exhibitions Bureauย (Bureau International des Expositions-BIE) will make the selection next year.

In the meantime the airline is adding adding “Expo 2020 Dubai UAE” stickers.

Expo 2020 Dubai UAE logo

Copyright Photo: Paul Denton. Airbus A380-861 A6-EDS (msn 086) arrives at the Dubai hub with the special logo (click on the photo for the full size view).

Hot New Photos:ย AG Hot New Photos

Emirates:ย AG Slide Show

Qatar Airways continues its agressive expansion, starts the use of synthetic Parafinic Kerosene

Qatar Airways (Doha) on January 7 launched its first new route of 2013 with the introduction of scheduled services to Gassim in the Kingdom of Saudi Arabia.ย The Doha โ€“ Gassim route is being operated by Airbus A320 aircraft featuring 144 seats in a two-class configuration of 12 seats in First Class and 132 in Economy.

Over the next few months, Qatar Airways will launch scheduled flights to a number of destinations including Najaf, Iraq (January 23); Phnom Penh, Cambodia (February 20); Chengdu, China (March 19); Chicago, USA (April 10); and Salalah, Oman (May 22).

Qatar Airways has also announced a capacity increase to daily scheduled services on the Doha โ€“ Warsaw route, effective February 1.

General Module ImageCapacity Upgrade On Doha โ€“ Warsaw Route From February 1

The current four-times-a-week service is scheduled to move to a daily operation less than two months after the launch of flights to Polandโ€™s capital city.

One of the worldโ€™s fastest growing airlines, Qatar Airways has seen rapid growth in just 16 years of operations, currently flying a modern fleet of 116 aircraft to 123 key business and leisure destinations worldwide.

In other news, on January 9,ย Qatar Petroleum (QP), Qatar Airways and Shell celebrated the first commercial introduction of a new aviation jet fuel โ€“ the first to be approved globally in over two decades. The innovative GTL Jet Fuel blended with Synthetic Parafinic Kerosene from the worldโ€™s largest Gas to Liquids plant – Pearl GTL in Qatar – is now flowing into fuel tanks at Doha International Airport.

An Airbus A340-600, flight QR 001 will make history by being the first to fly outbound from Doha International Airport, en route to London Heathrow using GTL Jet Fuel.

This is a significant milestone for the giant onshore Pearl GTL complex, which is jointly developed by QP and Shell and is the largest energy project in Qatar. Fully approved for use as an aviation fuel, GTL Jet Fuel is a blend of up to 50% GTL Synthetic Parafinic Kerosene (SPK) meeting the stringent requirements of ASTM-D-7566 and conventional crude oil-derived standard jet fuel (Jet A-1).

This product launch also marks the attainment of the highest stage of the so-called Fuel Readiness Level scale in the rigorous certification and qualification process of Fischer-Tropsch Synthetic Parafinic Kerosene blends with conventional Jet A-1 and creates a true โ€˜Drop Inโ€™ alternative fuel meeting the latest DEF STAN and ASTM international aviation standards.

General Module ImageA Qatar Airways Airbus A340-600 is fuelled with Gas-to-Liquids jet fuel ahead of the departure of flight QR001 from Doha to London Heathrow.

As an alternative to conventional crude oil-derived jet fuel, GTL Jet Fuel can help diversify the aviation fuel supply chain and offers a number of attractive benefits for airlines and airports. The synthetic blend component – GTL kerosene โ€“ contains virtually zero Sulphur and has been shown to produce lower particulate emissions (very fine soot particles) than conventional crude oil-derived jet fuel. This means that once blended with conventional jet fuel to create GTL Jet Fuel, it can be attractive to airlines and airport authorities keen to improve local air quality at busy airports by reducing local emissions. GTL kerosene also has a higher energy density than conventional oil-based kerosene. This has the potential to reduce the engine maintenance requirements and the required fuel payload and aircraft may be able to better optimise the weight of fuel to cover the same distance.

GTL Jet Fuel from Pearl GTL plant is marketed by โ€œTasweeqโ€ for use solely within Qatar. The first production cargo of GTL Jet Fuel left the Pearl GTL Plant on December 17, 2012 and will be first used in this inaugural flight departing Doha International Airport on January 9.

Shell is the largest foreign investor in Qatar investing up to $21 billion in the last 6 years. Qatar Petroleum and Shell delivered two of the largest energy projects in the world in Ras Laffan Industrial City. Pearl Gas to Liquids (GTL) is the worldโ€™s largest GTL plant and cements Qatarโ€™s position as the GTL capital of the world. At an investment of $ 18 โ€“ 19 billion it is the largest single investment in the Shell Groupโ€™s global portfolio.

The Qatargas 4 Liquefied Natural Gas project (QP (70%) and Shell (30%)) combines Shellโ€™s global leadership in LNG with Qatarโ€™s position as the worldโ€™s largest LNG supplier.

Shell has established a world-class research and development facility and a learning centre, the Qatar Shell Research & Technology Centre, at the Qatar Science & Technology Park. Shell has a financial commitment to invest up to $100 million on programmes at the Centre over a 10-year period.

In 2010, Shell and PetroChina signed an agreement with QP to explore in the pre-Khuff interval in Block D. In December 2011 Shell and QP signed a HOA to jointly develop a world-class petrochemicals complex in Ras Laffan Industrial City.

In other news for the company,ย a Qatar Airways-flown A320 has made the carrier the worldโ€™s first to operate an aircraft into the Nepalese capitalโ€™s Tribhuvan International Airport within the Himalayan mountain range using a new navigation approach.

The milestone flight took place with the Doha-based airlineโ€™s A320 performing an RNP-AR (Required Navigation Performance โ€“ Authorisation Required) approach to landing.ย  RNP-AR enables an aircraft to automatically fly accurate trajectories without relying on ground-based navigation aids, while also optimising airspace utilisation and reducing diversions in difficult weather conditions.

Located in Kathmandu, Tribhuvan International Airport has one of the worldโ€™s most complicated landing approaches due to surrounding challenging terrain at its location in the Himalayas.ย  Flying an RNP-AR approach considerably reduces pilotsโ€™ workload and allows them to take full benefit of the advanced navigation equipment installed in the Airbus A320 to easily circumnavigate difficult terrain.

Qatar Airways partnered with Quovadis, the Airbus-owned flight operations services company, and the Civil Aviation Authority of Nepal to design and implement the Kathmandu RNP-AR procedure.

Qatar’s New Doha International Airport will be renamed Hamad International Airport when the much delayed hub for Qatar Airways finally opens in the second half of 2013 according to article below. Qatar Airways will be the operator of the new airport which will allow the airline to expand operations.

Read the full report from ConstructionWeekOnline.com: CLICK HERE

Top Copyright Photo: Paul Denton. Airbus A320-232 A7-AHL (msn 4802) prepares to land at Dubai (other photos by Qatar Airways).

Qatar Airways logo

Qatar Airways:ย AG Slide Show

Finally, Qatar Airways has grounded its Boeing 787s but remains confident that the problems can be overcome. Watch the video interview by The Telegraph on a 787 flight from Doha to London: